SICA manages the full quality inspection process, from your needs to the report.
The equipment inspected by SICA includes:
•Tubular: Line pipe, Casing & Tubing (OCTG), Coiled tubing, Riser, Umbilical, Welded or seamless pipe
• Wellhead: Onshore wellhead, Sub sea wellhead, X’mas tree, Blow out Preventer (BOP)
• Valves: Ball valves, Gate valves, etc.
• Down hole equipment: Float equipment, Packer, Safety valve, Liner hanger, Mandrel, Electric Submersible Pump
• Refinery & Petrochemical: Pressure vessel, Heat exchanger, Cyclone, Mixer, Drum, Pump, Compressor, Turbine, Generator





